Lower Main Street over Green River Bridge Replacement (G-12-007)

Project Detail
Market
Location
Greenfield, Massachusetts
Client
Massachusetts Department of Transportation

The Lower Main Street (SR 2A) over Green River Bridge is a single-span bridge constructed in 1957 with a span length of 133’-0” from centerline-to-centerline of bearing and is not on a skew. HSH is providing preliminary and final bridge design, including bridge type selection worksheet, sketch plans, final design plans, specifications and construction cost estimate; traffic engineering; highway design; and temporary traffic control design from preliminary through final design phases. HSH will also provide Construction Phase services supporting the Massachusetts Department of Transportation (MassDOT).