Route 28 over MBTA and B&M Railroad

Project Detail
Market
Services

Massachusetts Department of Transportation
Andover, MA

Paul W. Berthiaume, P.E., was the Lead Bridge Engineer for this superstructure replacement project located in downtown Andover. The new bridge is a simple span bridge with a span length of 79’-9” and is on a 56-degree skew.  Project rehabilitated the North Abutment and Northwest wingwall utilizing EPS foam lightweight fill and tiebacks and constructed a new micropile supported abutment on the South end of the bridge. The bridge superstructure consisted of steel girders with a composite, reinforced concrete bridge deck and semi-integral abutments. This project was performed while at another firm.